Metal products · Installation accessories · Maintenance supplies
Industrial materials and project supply: what do we coordinate?
Focusing on factory maintenance, engineering installation and daily replenishment, assist in sorting out metal products, seals, tools and auxiliary materials from multiple Chinese suppliers into a purchase list. Communicate the material, size, quantity and allowed alternatives in advance, and plan the arrival in batches according to the project or location of use. The scope of warehouse inspection and marking is agreed in advance. The packaging focuses on rust prevention, sharp edges and the risk of mixed packaging of small parts. The shipment is then confirmed based on the actual weight and size and Ukraine's delivery conditions.
Correlate each material with drawings, material grade, size and required quantity. The seller verifies availability, and alternative materials or specifications are confirmed by you before purchasing to avoid inconsistent understandings from different suppliers.
02
Small parts classification and material protection
Fasteners, seals, and metal products are discussed by material item grouping and packaging labeling. Please confirm the range of rust protection, sharp edge protection and allowed mixing to avoid difficulty in identifying different specifications when receiving the goods.
03
Batch by construction site or project
When materials are used in multiple sites, confirm the composition and item identification of each batch separately before packaging. Please provide the order of demand and the receiving contact person, and then arrange the handover based on the actual preparation progress and available transportation.