Machine tools · Production lines · Engineering equipment
Machinery: what do we coordinate?
Mechanical equipment needs to be prepared for transportation in actual conditions. Coordinates packaging, loading and shipping handoffs based on weight, dimensions and destination site conditions.
Provide transportation drawings, weight, center of gravity and lifting points designated by the manufacturer, and explain whether the equipment can be disassembled. Use this information to discuss packaging and routing requirements, and simultaneously confirm Ukrainian site access and unloading equipment.
02
Precision machine tools and measuring equipment
Check with the manufacturer first to confirm moving parts locking, rail and sensitive surface protection, and accessories that need to be boxed. Incorporate photos of the agreed status, earthquake and moisture-proof requirements, and arrival handover methods into shipment preparations to facilitate item-by-item verification.
03
Production lines and splitting units
Sort out the split equipment modules according to the technical list, packing information and your installation sequence. Before shipment, confirm the module, cable and fastener identification, accompanying drawings and batch handover sequence to facilitate on-site reception.
During the temporary storage of equipment and accessories, how to record the quantity arriving at the warehouse, to be processed, and the quantity shipped out of the warehouse, and to confirm the storage billing, collection conditions, and batch shipping instructions to avoid treating the arrival at the warehouse as ready for shipment.
Assign selection, ordering, inspection, shipping and document handover to specific confirmers, and clarify the agreed work scope of purchasing agents, suppliers, warehouses, freight forwarders and consignees.
How to record sample version, size, appearance, test scope and change approval for equipment parts and customized product procurement in China to avoid the lack of common basis for "production as usual".